Categories

6M Extra Long Lead Length 5V 2A Mains AC-DC Adaptor Power Supply 4mmx1.7mm 4x1.7

  • Model: 6M Extra Long Lead Length 5V 2A
  • 7637 Units in Stock

 Ask a Question 

$17.50

Buy More,Save more.Need a large quantity?email us for a special quote.
QuantityDiscount Price
6 - 19$16.62
20 - 49$16.10
50 - 149$15.40
150 - 249$14.35
250 + $13.65


Add to Cart:

6M Extra Long Lead Length 5V 2A Mains AC-DC Adaptor Power Supply 4mmx1.7mm 4x1.7

SKU:
J5 T3
UPC:
7.62585E 12
Shipping:
Calculated at Checkout
Brand:
ACAdaptorsRUS
MPN:
J5 T3
EAN:
7625666982007
EAN:
7625645015764


All orders ship to worldwide.

Your IP Address is: 216.73.216.201
Copyright © 2026 Sale power adapters. Powered by AC DC POWER ADAPTER